Work description
Work Breakdown Structure (WBS)
The CHORIST work breakdown structure includes several sub-projects (SP):
- a SP focused on alert system (SP2); including communications from the citizens
- a SP focused on communications to the citizens (SP3)
- a SP focused on communications on the crisis field (SP4).
These are completed with transversal sub-projects:
- a SP focused on engineering support for developments (SP1);
- a SP focused on integration and validation (SP5);
- a SP dedicated to project management, standardization, dissemination, impact & exploitation (SP0).
This makes a total of 6 sub-projects.
Image 1 : WBS
WBS level 1: Sub Projects
The following table presents the SPs with a short description.
| SP | Title | Description |
|---|---|---|
| SP0 | Management, standardisation, dissemination, impacts & exploitation | Includes project management and work coordination, management of knowledge, standard-related and dissemination activities, impact analysis, perspective assessment and results exploitation preparation. |
| SP1 | Users inputs and overall engineering | Supporting SP to provide user inputs/guidance, requirements, system engineering, overall vision and coordination of SP developments. |
| SP2 | Risk assessment report systems | Addresses alert systems, risk awareness, risk assessment and training for risk response preparation. Development and test of related ICT-based systems. |
| SP3 | "Communication to the citizen" system | Addresses the design of messages to the citizens, as part of the crisis response, including human and cultural issues. Definition, development and test of a "communication to the citizen system" implementing message design, dispatching, formatting and carrying through selected communication channels. |
| SP4 | Emergency telecommunications systems on crisis site | Definition, development and test of emergency field telecommunication systems with special focus on emergency network deployment capability and interoperability. |
| SP5 | Integration, demonstration, assessment and recommendations | Integration of the ERME system technologies developed in the other SPs and validation through significant field trials. Demontration assessment and recommendations will be proposed for future work. |
Table 1 : Sub Projects of CHORIST
WBS level 2: Work Packages
The Project SP structure is broken down into work packages within each SP. A total of 20 work packages. WPs are indicated in the following table and their planning is shown next table.
| SP | SP title | WP | WP title |
|---|---|---|---|
| SP0 | Management, standardisation, dissemination, impacts & exploitation | WP01 | Project management and coordination |
| WP02 | Standardisation and dissemination activities | ||
| WP03 | Impacts and exploitation | ||
| SP1 | Users inputs and overall engineering | WP11 | User Advisory Board (UAB) coordination |
| WP12 | User requirements | ||
| WP13 | System engineering | ||
| SP2 | Risk assessment report systems | WP21 | Environmental Risk Awareness (ERAW) system |
| WP22 | Environmental Risk Assessment (ERAS) system | ||
| WP23 | Training system | ||
| WP24 | SP2 in-lab validation and assessment | ||
| SP3 | Communication to the citizen system | WP31 | Message design |
| WP32 | Communication channels | ||
| WP33 | SP3 in-lab validation and assessment | ||
| SP4 | Emergency communication systems on crisis site | WP41 | Telecom services definition |
| WP42 | Rapidly deployable systems | ||
| WP43 | Interoperability between narrowband and broadband systems | ||
| WP44 | SP4 in-lab validation and assessment | ||
| SP5 | Integration, demonstration, assessment and recommendations | WP51 | System integration |
| WP52 | System demonstration | ||
| WP53 | Demonstration assessment and recommendations |
Table 2 : Work Packages of CHORIST
The overall planning of the project presenting the various phases of the project are presented on the following figure:
Image 2 : Planning